Category image
Clutch replacement
⌖ NN10
Clutch replacement on Renault trafic BF60XPJ
Contact details and exact postcodes remain hidden. Sign in as a business to review the full scope and offer a price.
Category image
⌖ NN10
Clutch replacement on Renault trafic BF60XPJ
Prices are shown for transparency. Business names, customer details, messages and exact addresses remain private.
The first results will appear here after a business is selected.
These clearly marked examples show how price history and offer comparison can look. They are not real customer records.
Example
⌖ Birmingham · B15
Water was entering around the edge of a flat roof above a rear extension. The example scope covered locating the failed area, local deck checks, renewing the affect…
Example
⌖ Northolt · UB5
The unused space beneath the staircase was to be turned into made-to-measure storage with pull-out cupboards and closed sections. The example scope included measuri…
Example
⌖ Manchester · M20
The shower area needed new fittings, a replacement screen and renewed seals without a complete bathroom refit. The example included removing failed silicone, fittin…
Example
⌖ Leeds · LS6
An older consumer unit was to be replaced and the existing circuits tested before certification. The example quote covered the new board, protective devices, testin…
Example
⌖ Ealing · W5
Water was appearing on the loft timbers after prolonged rain. The job was priced for a local inspection around the roof valley and adjoining tiles, replacement of d…
Example
⌖ Liverpool · L18
Several radiators were slow to heat and the boiler was due a service. The example visit covered servicing, checking system pressure, bleeding and balancing radiator…
Example
⌖ Greenford · UB6
Several kitchen doors were sagging, two hinges had pulled loose and one drawer front was catching. The example repair covered reinforcing failed hinge fixings, repl…
Example
⌖ Bristol · BS7
A section of block paving had settled near the entrance and held standing water. The example work included lifting the affected blocks, correcting the base levels a…
Example
⌖ Sheffield · S10
Several cabinet doors needed realignment and the plinth below the sink unit had swollen after a small leak. The example included adjustments, replacement of the dam…
Example
⌖ Acton · W3
A living-room wall had blown plaster, old fixing holes and an uneven patch from previous electrical work. The example included removing loose material, stabilising …
Example
⌖ Nottingham · NG5
Bedroom walls had old cracks and uneven patched areas. The example scope covered preparation, local crack repair, skimming the affected walls and leaving them ready…
Example
⌖ Ruislip · HA4
Sliding wardrobe door had dropped from the runner and the lower guide was damaged. Repair included realignment, a new guide and adjustment of both doors.
Example
⌖ Newcastle upon Tyne · NE3
Two uPVC windows were difficult to close and allowed noticeable draughts. The example included hinge adjustment, replacement seals where required and checking the l…
Example
⌖ Hanwell · W7
One opening window no longer pulled tightly against the frame and a cold draught could be felt around the edge. The example repair covered hinge adjustment or repla…
Example
⌖ Cardiff · CF14
A run of garden fencing had loose panels and two damaged posts after strong winds. The example covered removing unsafe sections, replacing the failed posts and pane…
Example
⌖ Hillingdon · UB10
Several sections of block paving had sunk and moved. The example scope included lifting the affected area, rebuilding the base and relaying the blocks.
Example
⌖ Hillingdon · UB10
The felt covering on a timber garden shed had split along the upper edge and was letting rain onto the roof boards. The example included stripping the failed felt, …
Example
⌖ Glasgow · G12
The living room needed old flooring removed, local subfloor preparation and new engineered boards with perimeter trims. The example price covered installation and f…
Example
⌖ Southall · UB1
The customer wanted a new tiled splashback between the worktop and wall units while keeping the existing kitchen. The example scope included surface preparation, se…
Example
⌖ Ealing · W5
Old consumer unit required replacement together with inspection and testing of the existing household circuits.
Example
⌖ Uxbridge · UB8
A bedroom door had dropped on its hinges and was rubbing the floor and frame. The example repair included checking the frame, tightening or replacing hinge fixings,…
Example
⌖ Hayes · UB3
Intermittent leak from a concealed cistern and poor flush performance. The example repair covered access, replacement inlet parts and testing.
Example
⌖ Ruislip · HA4
Several deck boards had softened at the ends and part of the supporting frame felt springy. The example job covered lifting the affected boards, repairing local joi…
Example
⌖ Uxbridge · UB8
A small bathroom refresh without a full refit: replace shower screen and taps, renew silicone and tidy damaged finishes around the bath.
Example
⌖ Hayes · UB3
The boiler was operating but system pressure was gradually dropping and needed topping up. The example visit included a standard service, visual checks for obvious …
Example
⌖ West Drayton · UB7
A utility room had space for a washing machine but the existing water and waste points were in the wrong position. The example included extending the cold-water fee…
Example
⌖ Ruislip · HA4
Cracked tiles and worn flashing were allowing water into the loft during heavy rain. The example included localised tile replacement and flashing repair.
Example
⌖ Northwood · HA6
The timber side door to a garage was difficult to close after weathering and the lock no longer lined up with the keep. The example covered tightening and repairing…
Example
⌖ Ealing · W13
Walls and woodwork needed preparation and repainting after years of marks and small cracks.
Example
⌖ Northolt · UB5
The loft had patchy old boarding that compressed insulation and made safe access difficult. The example project allowed for lifting poor boards, creating a raised s…
Example
⌖ Northolt · UB5
Remove old flooring, prepare the subfloor and install engineered boards with new trims in a medium-size lounge.
Example
⌖ Southall · UB1
Some radiators stayed cool while others overheated. The example job covered a system check, bleeding and balancing.
Example
⌖ Greenford · UB6
The car developed a rough idle and intermittent engine warning light under acceleration. The example repair covered fault-code diagnosis, ignition and basic intake …
Example
⌖ Greenford · UB6
Uneven front path needed lifting and relaying with cleaner edges and a compacted base.
Example
⌖ Chiswick · W4
A low garden boundary wall had several loose bricks, washed-out mortar joints and a cracked top course. The example included taking down unstable local sections, cl…
Example
⌖ Hayes · UB4
Front brakes were worn and noisy. Example pricing includes replacement discs and pads plus a basic inspection.
Example
⌖ Uxbridge · UB8
Clutch was slipping under acceleration. The example scope covered diagnosis followed by clutch kit replacement.
Example
⌖ Acton · W3
Replace an old sink and mixer tap while retaining the existing worktop, then reconnect waste and water supplies.
Example
⌖ Hanwell · W7
Add two double sockets and replace three ceiling light fittings in occupied rooms with minimal making good.
Example
⌖ Hillingdon · UB10
Storm-damaged fence panels needed replacement and a timber gate required rehanging and adjustment.
Example
⌖ Chiswick · W4
Loose built-in shelving was strengthened, damaged edges repaired and the unit prepared for a fresh finish.
Example
⌖ Ealing · W5
After the leak had been fixed, the stained ceiling needed local repair, stain blocking and repainting.
Example
⌖ Southall · UB2
Old laminate was swollen at the edges. The example included removal, underlay, new laminate and trims.
Example
⌖ Northwood · HA6
A leaking joint and poorly aligned downpipe were causing water to run down the brickwork.
Example
⌖ West Drayton · UB7
Replace a noisy extractor fan and update two bathroom light fittings, including electrical testing.
Example
⌖ Hayes · UB3
Temperature control on the shower mixer had failed and silicone around the tray was deteriorated.
Example
⌖ Ruislip · HA4
Several paving slabs had moved and joints were breaking up. The example includes lifting loose slabs, rebedding and repointing.
Example
⌖ Greenford · UB6
Routine service combined with investigation of a front-end knocking noise over bumps.
Example
⌖ Uxbridge · UB9
Localised storm damage needed a small repair to prevent further water ingress without replacing the full roof.
Example
⌖ Ealing · W13
Internal shelf supports had failed and the hanging rail was pulling away. The example repair reinforced the structure and refitted the rail.
Browse genuine jobs and submit clear offers for free.